triangle

BUILD - TO - SUITE OR SELL A ZONE OF ECONOMIC ACTIVITY SIERAKOWO NORTH I, 1-20HA, RAWICZ-WROCŁAW, S5

Realizacja: 02.03.2018

Lokalizacja: S5 Sierakowo junction, 35 minutes to Wroclaw

Powierzchnia: 1-20ha

For one of the investors, we prepare a comprehensive investment offer, the purpose of which is to analyze the land property in Rawicz and other location, obtain a building permit and then guarantee a complete budget for the whole investment process (purchase of land and construction). In this regard, we are a project manager responsible for the entire process, including the preparation of the investment, construction project and supervision of construction works carried out by the selected general contractor, after the handover of the keys.

For the second investor, we prepare an offer for the sale of land property, which includes one of 6 plots with dimensions between 2 and 15 ha. As a result, he receives an offer regarding a design concept with an investor's cost estimate or a lease agreement for the construction of the building according to the build-to-suit investor's individual needs.

The third buyer is talking about the acquisition of the land itself, which sees in the property a great potential for investment preparation, on its own.

BASIC DATA IN THE ECONOMIC ACTIVITIES ZONE NORTH 1, SIERAKOWO, NEAR RAWICZ

District: Rawicki
Commune: Rawicz
Town: Sierakowo
Area: 35 ha
Type: Greenfield

PURPOSE: Industry

INFRASTRUCTURE

Electricity: power line in the immediate vicinity of the zone; GPZ - 2500m; connection conditions: WITHOUT LIMITATION
Gas: gas network - 1700m; connection conditions: 80 m3 / h
Water: water supply network in the zone
Sanitary sewerage: sanitary sewage system in the zone
Sewage treatment plant: Rawicz-ul. Półwiejska, about 7 minutes
Buildings: no

POSITION

The distance from the road with national parameters: directly at the plot DK 36 and was DK5
Express road number: S5 - Rawicz node: 3 minutes
Distance to the airport: 1 h - Starachowice Wrocław, 1h 40 min - Poznań Ławica
Distance from the rail: about 7 minutes
The town where the railway is located: Rawicz
Distance from the railway siding: approx. 8 minutes
The place where the railway siding is located: Rawicz

More information:

http://amwinter.pl/unikalnygrunts530minutwroclaw60minutpoznan,60.html
 